Our department is the earliest department established in KSVGH. The total number of staff is 29, including:1 director, 22 Engineers, 13 mechanics and 1 clerk.
We are responsible for the design, procurement, construction and maintenance of all the hospital construction projects involving water, electricity, air condition, elevator, medical equipment, building decoration, and maintenance.
The Eengineering and Maintenance Department is composed of the following four sections:
Design and building Section
Architecture design, construction and
maintenance.
General facility procurement and maintenance.
Building decoration and maintenance.
Mechanical and Electrical Section
Design, installation and procurement of system:
Plumbing and electricity
Fire-fighting equipment
Air conditioning
Elevator
Boiler
Pneumatic and electrical transport
Water treatment
Medical Engineering Section
Provides the following:
Plan, design, evaluation, invite tender, inspection of construction, and
repair and preventive maintenance on nurse call systems, electronic facilities
and medical gas pipeline distribution systems.
Incoming inspection, pre-purchase evaluation, electrical safety testing,
in-house repair service and preventive maintenance for medical equipment.
Supervision and assessment of outside service and service contracts
evaluation and management.
Identification of retiring obsolete equipment.
Maintenance Section
Medical facility maintenance.
Trouble shooting of medical and housing
appliances.
Administration Support
Administrative paperwork.
Engineering appliation.
Engineering purchase, documentation.
Engineering project control.
Personnel management.